Week of February 4th
-Complete Calender of Events Due 2/05
-Order Construction Materials
-Begin Layout for for Weblog Portfolio
-Add existing images to weblog portfolio
-Update Log

Week of February 11th
-Begin Construction (if materials are recieved)
-Construction: Cut Material to size
-Visit & Update Mentor
-Update Log

Week of February 18th
-Construction: Cut holes in steel flats
-Update Log

Week of February 25th
-Construction: Begin Welding Process
-Update Log
-Visit & Update Mentor

Week of March 3rd
-Construction: Continue Welding Process
-Begin Work on Press Release
-Update Log

Week of March 10th
-Construction: Finish Welding Process
-Press Release: Write Introduction, Body, Conclusion
-Press Release: Add Applicable Images/Illustrations
-Update Log
-Visit & Update Mentor

Week of March 17th
-Press Release Due 3/19
-Bring Test Vessel to Tech Lab
-Construction: Fitting Product to Vessel
-Update Log

Week of March 24th
-Spring Break

Week of March 31st
-Presentations Begin 4/02
-Prepare for Presentations
-Update Log
-Visit & Update Mentor
-Complete Mentor Contacts

10 comments:

BR said...

2/12/08- Recieved Steel Flats from allmetalsinc.com
2/12/08- Cut 3" Steel flat into two 20" sections

BR said...

2/13/08- Construction: Cut 1.25" Steel Flat (2) into 20" sections

BR said...

2/15/08- Drilled bolt access hole and 1/2" holes into first steel flat

BR said...

2/15/08- Drilled bolt access hole and 1/2" holes into first steel flat

BR said...

02/19/08- Drilled bolt access hole & 1/2" holes into second steel flat

BR said...

2/21/08- Attached SS Bolt, Washer & Nut assembly to drilled steel sections.

BR said...

3/11/08- Status Update: ready for welding to begin, preparations made to bring test vessel into school

5941 said...

3/30/08- Minor setback occured when test vessel sank over spring break with all equipment in it.

Vessel subsequently raised on 4/1/08 and restored to workable condition.

BR said...

4/4/08- Web Log updated with construction pictures, in prepartation for presentation

4/4/08- Outline created for presentation, to be handed in today

Unknown said...

4/8/08- Brought Test vessel into school via pickup truck, test fit oarlock mechanism to vessel.